Home | Case Studies | Air Balloon Primary School: Short of Space? Put the playground on the 1st floor
Client: Bristol Council
Contractor: Skanska
Architect: Batterham Matthews Design
Value: £5.2m
Location: Bristol
GIFA: 1267m²
The contractor sought an innovative solution to the demanding design and practicality challenges of creating an energy efficient twelve classroom two-storey school extension with the added complication of tight timescales. The project amalgamated an existing infant and junior school with the new extension linking to existing buildings via a bridge.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.