Search

Chilmington Green School

Chilmington Green School is a new 6FE secondary school set to open in September 2025, delivering state-of-the-art facilities for 1,140 pupils.

Chilmington Green Secondary School

Client: Department for Education

Contractor: Bowmer + Kirkland

Architect: Stride Treglown

Value: £10m

Location: Ashford, Kent

GIFA: 9257 m²

Completion: August 2025

Innovaré provided the Low Risk Rapid Build full structural solution for the Teaching Block and Sports Hall using our patented Low Carbon Fire Safe i-FAST panels. The Innovaré i-FAST panel has been designed and tested to provide inherent fire, acoustic structural and thermal performance. The structural timber panelised system included Pre-Manufactured Value (PMV) elements such as factory-fitted vapour control, windows and cladding.

Chilmington Green is the first DfE secondary school in England to incorporate a passive thermal labyrinth, supporting natural ventilation and cooling. The school has been designed to meet Net Zero Carbon in operation and is targeting a BREEAM Excellent rating.

External Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Roofs

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Floors

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.