Home | Case Studies | Co Op Academy Florence MacWilliams
Client: Department for Education
Contractor: Bowmer + Kirkland
Architect: Stride Treglown
Location: Stoke On Trent
GIFA: Gross wall area 4732 m²
Completion: Aug-25
Innovarés Low Carbon Fire Safe i-FAST offsite panelised system has been used to create a Low Risk Rapid Build wrap solution delivering a fast, efficient, and sustainable building envelope with excellent airtightness, high-level U-values, and minimal thermal bridging. The i-FAST panels come with factory-fitted windows and exterior cladding, which ensures consistent quality. The combination of Brick Slips and Swiss pearl cladding creates a durable, low-maintenance exterior with an enhanced appearance. This advanced level of pre-manufacture not only accelerates the construction timeline by enabling faster creation of weather tight structures but also reduces on-site risks and variability. By leveraging the controlled factory environment, our approach ensures higher quality interfaces, improved air tightness, and overall enhanced performance, delivering both efficiency and consistency across the build process.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.