Reigate Primary School: Primary School delivered 14 weeks early

The primary school needed a cost effective solution for the refurbishment of some existing buildings as well as the construction of a new hearing impaired unit for 26 pupils.

Reigate Primary School

Client: EFA

Contractor: Bowmer and Kirkland

Architect: Maber

Value: £3.7m

Location: Derby

GIFA: 2,536 m²

The primary school needed a cost effective solution for the refurbishment of some existing buildings as well as the construction of a new hearing impaired unit for 26 pupils. In addition, there were a number of key issues that had to be taken into account with this project including; disturbance and risk to pupils, parents and staff had to be minimised, the new building works had to be completed in a confined area, high environmental and sustainability goals had to be achieved and the need for additional and upgraded accommodation was urgent.

External Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Roofs

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Floors

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.