Abbey View Primary Academy: Demonstrating the Benefits of Offsite

The benefits of offsite construction were successfully realised when main contractor Morgan Sindall teamed up with Innovaré Offsite to create an innovative design that delivered a high quality, airtight and energy-efficient building for Abbey View Primary Academy.

Abbey View Primary Academy

Client: Buckinghamshire County Council

Contractor: Morgan Sindall

Architect: GSS Architecture

Value: £6.6m

Location: South East

GIFA: 1,756m2

The benefits of offsite construction were successfully realised when main contractor Morgan Sindall teamed up with Innovaré Offsite to create an innovative design that delivered a high quality, airtight and energy-efficient building for Abbey View Primary Academy.

Abbey View Primary Academy provides a first-class education facility with the potential to grow in-line with the surrounding population to ultimately accommodate 420 students with an additional 52 pre-school places.

Using advanced offsite manufactured timber technology maximised efficiency and quality on site. Abbey View was delivered on time and budget in just 42 weeks and snag free.

External Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Roofs

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Floors

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.