Search

Air Balloon Primary School: Short of Space? Put the playground on the 1st floor

The contractor sought an innovative solution to the demanding design and practicality challenges of creating an energy efficient twelve classroom two-storey school extension.

Air Balloon Primary School

Client: Bristol Council

Contractor: Skanska

Architect: Batterham Matthews Design

Value: £5.2m

Location: Bristol

GIFA: 1267m²

The contractor sought an innovative solution to the demanding design and practicality challenges of creating an energy efficient twelve classroom two-storey school extension with the added complication of tight timescales. The project amalgamated an existing infant and junior school with the new extension linking to existing buildings via a bridge.

External Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Roofs

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Floors

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.