Search
Search

Brindley Heath Academy

The project replaced outdated school facilities with a new primary school designed to support the needs of pupils, staff, and the wider community.

Brindley Heath Academy

Client: Department for Education

Contractor: Bowmer + Kirkland Ltd

Architect: Pick Everard

Value: -

Location: Kinver, Stourbridge

GIFA: 1,461m²

Completion: -

Innovaré supplied its Full Structure Solution using our Low Carbon Fire Safe 384mm i-FAST panels. Manufactured offsite in a controlled factory environment, the system provides structural, thermal, acoustic and fire performance within a single panelised solution. The approach enabled a high level of pre-manufactured value and supported quality control throughout construction.

You can now download a copy of our White Paper into Insights from Innovarés Roundtable on Navigating
the SEND Crisis Through Design and Delivery (2026)

External Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Roofs

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Floors

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.