Home | Case Studies | Chilmington Green School
Client: Department for Education
Contractor: Bowmer + Kirkland
Architect: Stride Treglown
Value: £10m
Location: Ashford, Kent
GIFA: 9257 m²
Completion: August 2025
Innovaré provided the Low Risk Rapid Build full structural solution for the Teaching Block and Sports Hall using our patented Low Carbon Fire Safe i-FAST panels. The Innovaré i-FAST panel has been designed and tested to provide inherent fire, acoustic structural and thermal performance. The structural timber panelised system included Pre-Manufactured Value (PMV) elements such as factory-fitted vapour control, windows and cladding.
Chilmington Green is the first DfE secondary school in England to incorporate a passive thermal labyrinth, supporting natural ventilation and cooling. The school has been designed to meet Net Zero Carbon in operation and is targeting a BREEAM Excellent rating.
Unit 3 Siskin Parkway West, Middlemarch Business Park, Coventry, CV3 4PW • T: 0845 674 0020 • E: enquiries@innovareoffsite.co.uk
2025 © Innovaré Offsite Ltd. All Rights Reserved. Accessibility • Privacy • Cookies • T’s & C’s • VAT No. GB 438 6435 70
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.