Home | Case Studies | Heath Mount School: Sympathetic design without compromising speed and quality
Client: Heath Mount School
Contractor: Ashe Construction
Architect: Vincent Gorbing
Value: £2.3m
Location: Hertford
GIFA: 880m²
The prestigious Heath Mount School required a new seven classroom teaching block and performing arts auditorium. Site access was restricted, designs needed to complement the existing Grade 1 listed buildings but make a statement of modern design, and disruption had to be minimal as the construction took place during term times. Additionally, there was a late change of roof design at the client’s request.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.