Client: South West Trains
Contractor: Osborne
Architect: Hyder Consulting
Value: £3m
Location: Greater London
GIFA: 217m²
South-West Trains needed an upgraded rail station to be ready for the Rugby World Cup. The construction work had to be to a robust design, completed rapidly and without risks to the safety or convenience of staff and passengers. Access to the site in a busy town centre location was constrained so a pre-assembled structure was not feasible.
The project was split into two phases: a larger booking hall with a new retail unit, ticket office and accessible toilet; followed by the main station redevelopment with improved access. Sustainability and fire safety were important considerations as well as a very tight timetable.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.