Search
Search

Southglade Primary School

Southglade Primary School in Nottingham had been identified by the Department for Education as no longer fit for purpose. The ageing buildings showed visible deterioration and no longer met the needs of a modern learning environment.

Southglade primary School

Client: Department for Education

Contractor: Bowmer + Kirkland

Architect: CPMG Architects

Location: Nottingham

GIFA: 1875 m²

Completion: November 2025

The new two‑form entry primary school provides places for 420 pupils, supported by an additional 52‑place nursery. The redesign enables a total capacity of 472 children aged between three and eleven. By reducing the overall building footprint, the project team created a larger, more flexible external environment that includes enhanced sports provision and dedicated outdoor learning areas.

External Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Roofs

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Floors

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.