Home | Case Studies | Standings Court: Using Construction to achieve certified Passivhaus
Client: Saxon Weald & Horsham Council
Contractor: Osborne
Architect: Miller Hughes
Value: £2m
Location: Horsham
As part of its commitment to sustainability the client wanted to build 12 homes that met the Passivhaus standards for energy use and CO2 emissions as well as 26 units that would meet the Level 5 of the Code for Sustainable Homes. The aim was to create homes that provide a high level of comfort whilst being as cost effective to run as possible for the occupant.
Unit 3 Siskin Parkway West, Middlemarch Business Park, Coventry, CV3 4PW • T: 0845 674 0020 • E: enquiries@innovareoffsite.co.uk
2021 © Innovaré Offsite Ltd. All Rights Reserved. Accessibility • Privacy • Cookies • T’s & C’s • VAT No. GB 438 6435 70 Normal 0 false false false EN-GB X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Times New Roman",serif;}
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.