Home | Case Studies | Turves Green School: Hybrid Technology
Client: Acivico
Contractor: Balfour Beatty
Architect: Atkins Global
Value: £23m
Location: Birmingham
GIFA: 6611
Completion: February 2021
Located in Birmingham, Turves Green Girls’ School is a secondary school with 750 students. A feasibility study by Balfour Beatty concluded that the original school would not be able to obtain warranties to give the building a viable future.
Architects Atkins Global designed a bright and airy new school, filled with natural light, with wide corridors to help ensure a calm and pleasant environment. Advanced offsite construction technology kept the build schedule on track despite the pandemic.
*Images by Balfour Beatty
Unit 3 Siskin Parkway West, Middlemarch Business Park, Coventry, CV3 4PW • T: 0845 674 0020 • E: enquiries@innovareoffsite.co.uk
2021 © Innovaré Offsite Ltd. All Rights Reserved. Accessibility • Privacy • Cookies • T’s & C’s • VAT No. GB 438 6435 70 Normal 0 false false false EN-GB X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Times New Roman",serif;}
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.