Client: Department for Education
Contractor: Bowmer & Kirkland
Architect: Strides Treglown Architects
Value: £38.4m
Location: Coventry
GIFA: 12,099m²
Completion: Autumn 2023
The factory fitting of vapour control, windows, and cladding enhanced the quality and integrity of important detailing whilst also accelerating the construction programme.
Scope of works also included offsite manufactured volumetric plant rooms for the project which Innovaré designed and delivered in collaboration with our M+E specialist, DBS. Increasing Pre-Manufactured Value to 70%- a key driver for the DfE, the Innovaré building solution achieves thermal and airtightness levels required for net zero carbon in operation.
Unit 3 Siskin Parkway West, Middlemarch Business Park, Coventry, CV3 4PW • T: 0845 674 0020 • E: enquiries@innovareoffsite.co.uk
2025 © Innovaré Offsite Ltd. All Rights Reserved. Accessibility • Privacy • Cookies • T’s & C’s • VAT No. GB 438 6435 70
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.