West Coventry Academy

West Coventry Academy (WCA), which was procured through the DfE’s Modern Methods of Construction Framework (MMC1), is the result of a three-year research journey by Innovaré Offsite and a major investment by our partner Bowmer + Kirkland (B+K)

West Coventry Academy

Client: Department for Education

Contractor: Bowmer & Kirkland

Architect: Strides Treglown Architects

Value: £38.4m

Location: Coventry

GIFA: 12,099m²

Completion: Autumn 2023

The factory fitting of vapour control, windows, and cladding enhanced the quality and integrity of important detailing whilst also accelerating the construction programme.

Scope of works also included offsite manufactured volumetric plant rooms for the project which Innovaré designed and delivered in collaboration with our M+E specialist, DBS. Increasing Pre-Manufactured Value to 70%- a key driver for the DfE, the Innovaré building solution achieves thermal and airtightness levels required for net zero carbon in operation.

External Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Roofs

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Floors

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.