Home | Case Studies | Wye Valley Community Diagnostic Centre
Client: Wye Valley NHS Trust
Contractor: Speller Metcalfe Limited
Architect: Medical Architecture & Architype
Value: £18m
Location: Hereford
GIFA: 1,140m²
Completion: September 2024
The building utilises Innovare’s #LowCarbonFireSafe 384mm i-FAST panel and #Lowriskrapidbuild Full Structure solution. The Innovaré full structure solution consists of timber-based i-FAST wall panels with a hybrid low-carbon material approach for the floor and roof components.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.