Improve Productivity and Performance
Manufactured construction designed around a kit of parts means faster, better, more sustainable construction:
- Change the method
- Change the mindset
- Change the result
Low cost, low carbon, high performance buildings. Designed without compromise around end users. Delivered through a proven, streamlined process.
Accelerate Delivery, Control Costs
Reduce time and cost from procurement to delivery.
A kit of parts with pre-accreditation, verified performance data and a streamlined process make the Construction Playbook goals deliverable.
A Faster Route to Net Zero
Highly insulated, airtight buildings ensure low carbon operation.
The high structural timber content means low or even negative levels of embodied carbon.
WHAT WE DO
We are an offsite construction specialist and our purpose is to create exemplar spaces for people to live or Learn. We are the market leader in delivering panelised offsite techniques to simplify the construction process and are uniquely placed to be a full service technology partner bringing the speed, predictability and cost advantages of working with offsite construction.
At our specialist manufacturing facility in Coventry, manufacturing disciplines and streamlined production processes deliver greater speed and efficiency. Building prefabricated high performance panels that are designed with load bearing capacity, structural integrity, thermal performance, fire resistance and acoustic performance and provides a complete dry structure. This leads to fewer concessions and opens up more opportunities for clever value engineering with a quicker speed of build than traditional construction. Replacing a traditional steel or concrete structure with a lightweight timber frame and panels which include internal and external walls, floors and roofs.
Why we are finally talking seriously about
offsite construction
Suddenly, everyone seems to be talking about Modern Methods of Construction (MMC), offsite construction and a variety of terms related to different ways of building. Having been in the offsite industry for over ten years, it’s been interesting to watch the rapid transformation from ‘how we might build in the future’ to ‘how we need to be building right now’.
A TRACK RECORD OF LOW CARBON PROJECT DELIVERY
Innovaré Offsite has been delivering low-carbon, high-performance education, residential and healthcare buildings for over ten years. Projects are characterised by shortened timescales and on-target, on-budget delivery.
Schools built
Residential Developments built
Health centres built
PRICE TO WIN, IMPROVE YOUR MARGINS
Discover how our partnerships with developers and contractors multiply the benefits of offsite from project to project. Better outcomes for customers and sustainable margins for our partners.
The 5Ps of Innovaré Offsite
Following on from the UN’s sustainable development goals and RIBA’s sustainable outcomes, Innovaré Offsite have developed our own 5P framework to articulate and drive how we’re simplifying offsite construction and putting sustainability at the forefront of our business.
Innovaré Offsite’s 5Ps are: People, Place, Planet, Productivity and Partnership.
These 5 key values are behind every project that we work on. They help us to focus on achieving greater certainty of delivery and quality for each project we work on for clients as well as the wider sustainability goals for the construction industry as a whole. Hover and click the images below to find out more about each of the Ps and how Innovaré Offsite is applying these values.