Search

Higher

Our projects in higher education include facilities for teaching, research, student services and accommodation.

The manufactured construction process is ideal for creating buildings that are accessible to all, easy to maintain and energy efficient.

Education projects

See case studies below covering low carbon, high performance primary education projects we’ve delivered.

The client required a new 1,100 bed student accommodation comprising of three residential tower blocks ranging from 9-19 storeys.
It was identified by the Education Department that Rockwood Academy required an additional 400 plus school places to support the growth of the local community, increasing the school’s capacity from 648 to 1050.
Red Kite Academy was created to deliver much-needed school places for children with a range of learning difficulties and special educational needs.
The London Borough of Barking and Dagenham required a new build primary to secondary all-through school for a new urban development in Barking.

External Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Roofs

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Floors

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Walls

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.