These must bring new facilities on stream quickly while delivering exceptional levels of quality and performance.
The Innovaré Offsite approach is based on manufactured construction and a kit of parts. It delivers new buildings that blend low maintenance with rapid delivery and the capability to be part of net zero carbon healthcare.
The systemised approach to construction ensures that timing, cost and quality are all tightly controlled. These solutions are ideal when you need to develop healthcare facilities on hard to access sites and in live working environments.
See case studies below covering low carbon, high performance healthcare construction projects we’ve delivered.
Unit 3 Siskin Parkway West, Middlemarch Business Park, Coventry, CV3 4PW • T: 0845 674 0020 • E: enquiries@innovareoffsite.co.uk
2021 © Innovaré Offsite Ltd. All Rights Reserved. Accessibility • Privacy • Cookies • T’s & C’s • VAT No. GB 438 6435 70 Normal 0 false false false EN-GB X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-pagination:widow-orphan; font-size:10.0pt; font-family:"Times New Roman",serif;}
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.